2024
DOI: 10.1371/journal.pone.0304119
|View full text |Cite
|
Sign up to set email alerts
|

Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints

Rafael Muñoz-Sánchez,
Iris Martínez-Salazar,
José Luis González-Velarde
et al.

Abstract: Two hybrid flow shop scheduling lines must be coordinated to assemble batches of terminated products at their last stage. Each product is thus composed of two jobs, each produced in one of the lines. The set of jobs is to be processed in a series of stages to minimize the makespan of the scheduling, but jobs forming a product must arrive at the assembly line simultaneously. We propose a mixed integer linear programming model. Then, based on the model, we propose a pull-matheuristic algorithm. Finally, we prese… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 47 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?