2021
DOI: 10.1002/eej.23330
|View full text |Cite
|
Sign up to set email alerts
|

Two stage operation scheme for a microgrid including hydrogen production as a part of demand

Abstract: The authors focus on a microgrid (MG) including hydrogen production processes as a part of demand. The studied MG consists of a photovoltaic (PV), a battery storage system, two different type electrolyzers, and electric/fuel steam boilers and supplies for the electric, thermal and hydrogen demands. This paper proposes detailed operation scheme which consists of two stages, namely, the day ahead scheduling and the real‐time (RT) control. The day ahead scheduling optimizes the operations of system components in … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 6 publications
0
0
0
Order By: Relevance