Two-step approach for scheduling jobs to non-related parallel machines with sequence dependent setup times applying job splitting

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2025
2025

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 26 publications
0
1
0
Order By: Relevance
“…The optimization problem exists in various fields in the real world, including engineering design optimization [1][2][3], image thresholding [4][5][6], topology optimization [7][8][9], multi-objective optimization [10][11][12], workshop scheduling [13][14][15], and more. In engineering design optimization problems, achieving a balance between resource allocation and constraint conditions is often challenging.…”
Section: Introductionmentioning
confidence: 99%
“…The optimization problem exists in various fields in the real world, including engineering design optimization [1][2][3], image thresholding [4][5][6], topology optimization [7][8][9], multi-objective optimization [10][11][12], workshop scheduling [13][14][15], and more. In engineering design optimization problems, achieving a balance between resource allocation and constraint conditions is often challenging.…”
Section: Introductionmentioning
confidence: 99%