2010 18th Iranian Conference on Electrical Engineering 2010
DOI: 10.1109/iraniancee.2010.5506950
|View full text |Cite
|
Sign up to set email alerts
|

Unit maintenance scheduling by means of fuzzy-game theory, considering uncertainty in rival-Genco's data

Abstract: Gencos, in a restructured power system, try to schedule their generators' maintenance in order to maximize their profit. Besides, Unit Maintenance Scheduling (UMS) as a mid-term plan has a significant effect on the Genco's profit in a power market. In a regulated power system, UMS is usually determined by a central system, such as System Operator (SO). On the other hand, in a de-regulated power system, UMS is determined through multiple interactions between the market players, mainly Gencos and SO. Considering… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 18 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?