“…Total acquisition time was 60 s for each analysis comprising a 30 s background measurement, 30 s of ablation and a 40 s delay between analysis allowing for adequate wash-out, gas stabilization and processing time. The following isotopes were analysed 23 Na, 24 Mg, 27 Al, 28 Si, 31 P, 34 S, 39 K, 43 Ca, 45 Sc, 47 Ti, 51 V, 55 Mn, 56 Fe, 57 Fe, 59 Co, 60 Ni, 63 Cu, 66 Zn, 75 As, 85 Rb, 88 The analyses of reference materials were performed after every ten sample analyses and comprised readings identical in every respect to that of the samples. Two analyses of NIST 612, followed by one of NIST 610 and a final two NIST 612 analyses comprised the standard run.…”