2007
DOI: 10.1016/j.mcm.2007.03.017
|View full text |Cite
|
Sign up to set email alerts
|

Using ANP priorities with goal programming in resource allocation in transportation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
42
0
2

Year Published

2009
2009
2021
2021

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 109 publications
(44 citation statements)
references
References 21 publications
0
42
0
2
Order By: Relevance
“…Table 12 gives the most cited 20 articles in this field. [190] 2007 35 There is no study on fuzzy ANP using the extended fuzzy sets, including hesitant, type-2 and intutionistic fuzzy sets.…”
Section: Fuzzy Anp Methodsmentioning
confidence: 99%
“…Table 12 gives the most cited 20 articles in this field. [190] 2007 35 There is no study on fuzzy ANP using the extended fuzzy sets, including hesitant, type-2 and intutionistic fuzzy sets.…”
Section: Fuzzy Anp Methodsmentioning
confidence: 99%
“…Liu and Chen (2007) presented a systemic procedure to combine the AHP and the FDM for assessing slope rock mass quality estimates, and the FDM was used to synthesize the responses of the questionnaires from the experts. Wey and Wu (2007) proposed a transportation infrastructure selection methodology which reflects interdependencies among evaluation criteria and candidate projects using the FDM and the ANP and formulates a zeroone goal programming model. Büyüközkan and Ruan (2008) used a weighted FDM to determine the aggregated fuzzy weight of criteria and proposed a fuzzy multi-criteria decision approach in evaluating software development projects.…”
Section: Delphi Methodsmentioning
confidence: 99%
“…In literature, different approaches are used to achieve the objective using different techniques such as the analytical network process (ANP) and analytical hierarchy process (AHP). In this paper, the ANP is used as it is widely used in literature in different fields such as software engineering, wireless sensor network (WSN), VANETS, and resource management [26][27][28][29]. In software engineering, an ANP is used for software component selection.…”
Section: Multicriteria Decision-makingmentioning
confidence: 99%