2000
DOI: 10.1061/(asce)0733-947x(2000)126:4(313)
|View full text |Cite
|
Sign up to set email alerts
|

Using ELECTRE III to Choose Route for Dublin Port Motorway

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
16
0
1

Year Published

2008
2008
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 36 publications
(17 citation statements)
references
References 8 publications
0
16
0
1
Order By: Relevance
“…Measurement of the tradeoffs among the criteria is revealed in multi-objective (rather than single objective) optimization (for examples, see Azis 1990;Piantanakulchai 2005;Rogers and Bruen 2000;Shang et al 2004). is has lead to the popularity of the decision-support systems that play an increasing role in the recent development of urban systems analytical methods used in conjunction with a geographical information system (GIS).…”
Section: Background On Method: Urban Systems Analysis and Anpmentioning
confidence: 99%
“…Measurement of the tradeoffs among the criteria is revealed in multi-objective (rather than single objective) optimization (for examples, see Azis 1990;Piantanakulchai 2005;Rogers and Bruen 2000;Shang et al 2004). is has lead to the popularity of the decision-support systems that play an increasing role in the recent development of urban systems analytical methods used in conjunction with a geographical information system (GIS).…”
Section: Background On Method: Urban Systems Analysis and Anpmentioning
confidence: 99%
“…These crisp outranking relations correspond to -cuts of , , where the cutting level represents the minimum value for , so that is true (Rogers & Bruen, 2000).…”
Section: Electre IIImentioning
confidence: 99%
“…This application is based on a real-life case study where the ELECTRE III method was use to help choose route for Dublin port motorway [15].…”
Section: An Applicationmentioning
confidence: 99%