2016 13th International Conference on the European Energy Market (EEM) 2016
DOI: 10.1109/eem.2016.7521198
|View full text |Cite
|
Sign up to set email alerts
|

Utilizing local energy storage for congestion management and investment deferral in distribution networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0
3

Year Published

2017
2017
2022
2022

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 15 publications
(10 citation statements)
references
References 13 publications
0
7
0
3
Order By: Relevance
“…Instead, DSO obligated to stabilizing local grids may consider storage integration if investment cost for alternative measures exceeds BESS cost [158]. Others have analyzed more general the technical constraints and potential profitability of BESS for investment deferral in local power grids [159,160].…”
Section: Grid Support and Investment Deferral (G)mentioning
confidence: 99%
“…Instead, DSO obligated to stabilizing local grids may consider storage integration if investment cost for alternative measures exceeds BESS cost [158]. Others have analyzed more general the technical constraints and potential profitability of BESS for investment deferral in local power grids [159,160].…”
Section: Grid Support and Investment Deferral (G)mentioning
confidence: 99%
“…S. B. Pienaar et al [88] claim that BESS can optimally defer distribution upgrade when connected to the MV network. BESS is then placed on the congested side of the corresponding infrastructure (e.g., substation, overloaded transformer) and mostly placed downstream of the distribution feeder [9,33,89].…”
Section: Distribution Grid Upgrade Deferralmentioning
confidence: 99%
“…Bu uygulama, Puant Yük Limitleme ve Yatırım Öteleme uygulamasıyla benzer nitelikler taşır. Buradaki amaç şebeke kısıtlılıklarının aktif olarak yönetilebilmesi için bataryanın şarj deşarj edilmesi şeklindedir (K. Spiliotis, 2016). Ölçek olarak burada takip edilen kısıtlılıklar dağıtım trafosu seviyesinden iletim trafosu seviyesine kadar çıkabilmekte, genellikle otonom algoritmalar yerine bir operatör tarafından kısıtlılığı önleyecek şekilde batarya sistemine komut verilmesi olarak karşımıza çıkmaktadır.…”
Section: Sıkışıklık Yönetimiunclassified