1991
DOI: 10.3130/aijsx.419.0_145
|View full text |Cite
|
Sign up to set email alerts
|

VERIFICATION OF VIBRATION CONTROL EFFECT IN ACTUAL STRUCTURE : Study of vibration control damper using sloshing of water (Part 2)

Abstract: The vibration contrQl

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

1996
1996
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…The first real-life installation of a TSD system of intermediate-depth was also in Japan in the Gold Tower at Utazu, Kagawa prefecture in the year 1988 (Noji et al, 1990(Noji et al, , 1991 (see Figure 15(a)). The tower is 158 m tall.…”
Section: Gold Tower At Utazumentioning
confidence: 99%
See 4 more Smart Citations
“…The first real-life installation of a TSD system of intermediate-depth was also in Japan in the Gold Tower at Utazu, Kagawa prefecture in the year 1988 (Noji et al, 1990(Noji et al, , 1991 (see Figure 15(a)). The tower is 158 m tall.…”
Section: Gold Tower At Utazumentioning
confidence: 99%
“…The TSDs are used to control vibration along the east–west direction along which the maximum width of the building in plan is 15.4 m. There are 16 number of TSDs each having 2.5 m length and 0.45 m width, placed on the floor at 135 m level. The TSD system has increased the structural damping of the tower from 0.35% to 3% (Noji et al, 1991). Here, nets have been used as FDD in the TSDs to get the required level of damping (see Figure 15(b)).…”
Section: Real-life Implementations Of Tldsmentioning
confidence: 99%
See 3 more Smart Citations