2020
DOI: 10.18280/ijsdp.150408
|View full text |Cite
|
Sign up to set email alerts
|

Visualization of Foundation Evaluation for Urban Rail Transit Based on CGB Technology Integration

Abstract: In urban rail transit projects, the traditional method of foundation evaluation faces problems like vague description, unclear process, and fuzzy evaluation system. To solve these problems, this paper sets up a scientific evaluation system based on CGB technology integration and analytic hierarchy process (AHP). The CGB technology integration refers to the integrated application of computer-aided design (CAD), geographic information system (GIS), and building information modeling (BIM). Taking Qingxihe Station… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 22 publications
0
2
0
Order By: Relevance
“…The face represents a region, which can be a province or an economic circle. The network performance of transportation infrastructure is enough to build an economic system in each region and, at the same time, ensures the effective circulation of various production factors among regions, which is conducive to the allocation of resources and ensures the realization of the integration goal [15].…”
Section: Literature Reviewmentioning
confidence: 99%
“…The face represents a region, which can be a province or an economic circle. The network performance of transportation infrastructure is enough to build an economic system in each region and, at the same time, ensures the effective circulation of various production factors among regions, which is conducive to the allocation of resources and ensures the realization of the integration goal [15].…”
Section: Literature Reviewmentioning
confidence: 99%
“…The data (such as: wrong data, measurement points that are again for early warning after an early warning, etc.) are not specially processed on the construction site [4,5]. The existing construction monitoring system has not fully played its role in construction safety management.…”
Section: Fig 11 Integration Of Bim and Gismentioning
confidence: 99%