Voltage and Reactive Power Estimation for Contingency Analysis Using Sensitivities

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
54
0
2

Year Published

2010
2010
2017
2017

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 62 publications
(56 citation statements)
references
References 17 publications
0
54
0
2
Order By: Relevance
“…After a generator outage, the lost power needs to be temporarily provided by other generators, and a generator re-dispatch may then be needed if the outage cannot be restored quickly. For simplicity, all lost power is assumed to be picked up by the system slack bus by following [27] and many commercial software packages, e.g., PSSIE and PowerWorld. The N -2 cases include simultaneous outages of two lines, or one line and one generator.…”
Section: Constraint Satisfaction Problem Formulationmentioning
confidence: 99%
“…After a generator outage, the lost power needs to be temporarily provided by other generators, and a generator re-dispatch may then be needed if the outage cannot be restored quickly. For simplicity, all lost power is assumed to be picked up by the system slack bus by following [27] and many commercial software packages, e.g., PSSIE and PowerWorld. The N -2 cases include simultaneous outages of two lines, or one line and one generator.…”
Section: Constraint Satisfaction Problem Formulationmentioning
confidence: 99%
“…A bender-decomposition approach is used in [12] to incorporate a system security assessment. The method presented in [13] is used in this paper to find optimal system reinforcement which uses line loading and generation shift factors to calculate post contingency line flows and bus voltages [14]: The number of shift factor that should be calculated for the system parameters is a function of NAT NAL × . So, the less the number of candidate lines and transformers, the smaller the number of shift factors would be.…”
Section: Optimal System Reinforcementmentioning
confidence: 99%
“…The contingency analysis, which is a well-known function in power system planning and operation [11][12][13][14][15], is used later to predict the contingencies which make system violated and rank the contingencies according to their relative severity. An outage of a transmission line, capacitor bank or transformer may lead to over loads in other branches and sudden system voltage rise or drop.…”
Section: Introductionmentioning
confidence: 99%