2021
DOI: 10.1049/rpg2.12242
|View full text |Cite
|
Sign up to set email alerts
|

Wave energy converter platform stabilisation and mooring load reduction through power take‐off control

Abstract: Mooring systems are a significant capital cost of a floating wave energy converter and their premature failure negatively impacts operational costs. Excessive peak loads and accumulated fatigue damage can lead to failure, so these factors are cost drivers in wave energy converter design. Here, the potential to reduce platform motion and mooring loads through modification of the power take-off (PTO) control are investigated. An approximate velocity tracking control strategy is implemented with a linear quadrati… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 13 publications
0
0
0
Order By: Relevance