2023
DOI: 10.1088/1742-6596/2594/1/012013
|View full text |Cite
|
Sign up to set email alerts
|

Wygd Study on prediction method of drilling pressure in low permeability oilfield

Ce Liu

Abstract: During the high water cut development stage of low permeability in M block, the overall recovery degree is low, there has 100 infilling wells been drilled since 2020 to improve the development effect. Before drilling, in order to avoid the risk of pressure safety, it is necessary to shut down the peripheral water injection wells to relieve the pressure, at the same time.Since the M Block reservoir is a low permeability reservoir, the pressure relief time after drilling off is long, which increases the impact o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 10 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?