Demonstrating improved confinement of energetic ions is one of the key goals of the Wendelstein 7-X (W7-X) stellarator. In the past campaigns, measuring confined fast ions has proven to be challenging. Future deuterium campaigns would open up the option of using fusion-produced neutrons to indirectly observe confined fast ions. There are two neutron populations: 2.45 MeV neutrons from thermonuclear and beam-target fusion, and 14.1 MeV neutrons from DT reactions between tritium fusion products and bulk deuterium. The 14.1 MeV neutron signal can be measured using a scintillating fiber neutron detector, whereas the overall neutron rate is monitored by common radiation safety detectors, for instance fission chambers. The fusion rates are dependent on the slowing-down distribution of the deuterium and tritium ions, which in turn depend on the magnetic configuration via fast ion orbits. In this work, we investigate the effect of magnetic configuration on neutron production rates in W7-X. The neutral beam injection, beam and triton slowing-down distributions, and the fusion reactivity are simulated with the ASCOT suite of codes. The results indicate that the magnetic configuration has only a small effect on the production of 2.45 MeV neutrons from DD fusion and, particularly, on the 14.1 MeV neutron production rates. Despite triton losses of up to 50 %, the amount of 14.1 MeV neutrons produced might be sufficient for a time-resolved detection using a scintillating fiber detector, although only in high-performance discharges.
After completing the main construction phase of Wendelstein 7-X (W7-X) and successfully commissioning the device, first plasma operation started at the end of 2015. Integral commissioning of plasma start-up and operation using electron cyclotron resonance heating (ECRH) and an extensive set of plasma diagnostics have been completed, allowing initial physics studies during the first operational campaign. Both in helium and hydrogen, plasma breakdown was easily achieved. Gaining experience with plasma vessel conditioning, discharge lengths could be extended gradually. Eventually, discharges lasted up to 6 s, reaching an injected energy of 4 MJ, which is twice the limit originally agreed for the limiter configuration employed during the first operational campaign. At power levels of 4 MW central electron densities reached 3 × 1019 m−3, central electron temperatures reached values of 7 keV and ion temperatures reached just above 2 keV. Important physics studies during this first operational phase include a first assessment of power balance and energy confinement, ECRH power deposition experiments, 2nd harmonic O-mode ECRH using multi-pass absorption, and current drive experiments using electron cyclotron current drive. As in many plasma discharges the electron temperature exceeds the ion temperature significantly, these plasmas are governed by core electron root confinement showing a strong positive electric field in the plasma centre.
Electron-positron plasmas are unique in their behavior due to the mass symmetry. Strongly magnetized electron-positron, or pair, plasmas are present in a number of astrophysical settings, such as astrophysical jets, but they have not yet been created in the laboratory. Plans for the creation and diagnosis of pair plasmas in a stellarator are presented, based on extrapolation of the results from the Columbia Non-neutral Torus stellarator, as well as recent developments in positron sources. The particular challenges of positronium injection and pair plasma diagnostics are addressed.
The next step in the Wendelstein stellarator line is the large superconducting device Wendelstein 7-X, currently under construction in Greifswald, Germany. Steady-state operation is an intrinsic feature of stellarators, and one key element of the Wendelstein 7-X mission is to demonstrate steady-state operation under plasma conditions relevant for a fusion power plant. Steady-state operation of a fusion device, on the one hand, requires the implementation of special technologies, giving rise to technical challenges during the design, fabrication and assembly of such a device. On the other hand, also the physics development of steady-state operation at high plasma performance poses a challenge and careful preparation. The electron cyclotron resonance heating system, diagnostics, experiment control and data acquisition are prepared for plasma operation lasting 30 min. This requires many new technological approaches for plasma heating and diagnostics as well as new concepts for experiment control and data acquisition.
The superconducting stellarator device Wendelstein 7-X, currently under construction, is the key device for the proof of stellarator optimization principles. To establish the optimized stellarator as a serious candidate for a fusion reactor, reactor-relevant dimensionless plasma parameters must be achieved in fully integrated steady-state scenarios. After more than 10 years of construction time, the completion of the device is now approaching rapidly (mid 2014). We discuss the most important lessons learned during the device assembly and first experiences with coming major work packages. Those are (a) assembly of about 2500 large, water-cooled, 3d-shaped in-vessel component elements; (b) assembly of in total 14 superconducting current leads, one pair for each coil type, (c) assembly of the device periphery including diagnostics and heating systems. In the second part we report on the present status of planning for the first operation phase (5 − 10 s discharge duration at 8 MW heating power), the completion and hardening of the device for full power steady-state operation, and the second operation phase (up to 30 min discharge duration at 10 MW heating power). It is the ultimate goal of operation phase one to develop credible and robust discharge scenarios for the high-power steady-state operation phase two. Beyond the improved equilibrium, confinement, and stability properties owing to stellarator optimization, this requires density control, impurity control, edge iota control as well as high density microwave heating. Of paramount importance is the operation of the island divertor, which is realized in the first operation phase as an inertially cooled conventional graphite target divertor. It will be replaced later on by the steady-state capable island divertor with its water-cooled carbon fiber reinforced carbon target elements.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.