Proceedings of SPE Annual Technical Conference and Exhibition 2005
DOI: 10.2523/96154-ms
|View full text |Cite
|
Sign up to set email alerts
|

10k Dual Splitter Wellheads: First Worldwide Application on the Development of an Offshore Gas Field

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2009
2009

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…To this end an initial section of each 46" conductor would need to be run open-ended to seabed to act as a drilling assembly conduit prior to spud. Use of open-ended conductor in turn obviated simple use of internal conductor guides or landing rings (Tuah et al, 2000, Anchaboh et al, 2001Faget et al, 2005) into which subsequent 18-5/8" strings could be run. Dual 18-5/8" conduit strings would need to be installed unguided into open ended 46" conductor.…”
Section: " Conductor Installationmentioning
confidence: 99%
“…To this end an initial section of each 46" conductor would need to be run open-ended to seabed to act as a drilling assembly conduit prior to spud. Use of open-ended conductor in turn obviated simple use of internal conductor guides or landing rings (Tuah et al, 2000, Anchaboh et al, 2001Faget et al, 2005) into which subsequent 18-5/8" strings could be run. Dual 18-5/8" conduit strings would need to be installed unguided into open ended 46" conductor.…”
Section: " Conductor Installationmentioning
confidence: 99%