2020
DOI: 10.1097/01.ccm.0000731056.53582.4c
|View full text |Cite
|
Sign up to set email alerts
|

1292: A Multivariate Machine Learning Algorithm for Occult Hemorrhage in a Porcine Model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
1
0
Order By: Relevance
“…Project schedule control, like cost control and quality control, is one of the key control objects of the project and an important means to ensure that the project is completed on schedule, reasonably arrange resource allocation and control input costs. The progress control of the project lasts from the start of the project to the end of the project, which is a long-lasting and dynamic process management [8][9]. After completing the preparation of the project schedule, the actual project schedule fed back from the project construction is compared with the planned schedule, so as to clarify the progress speed of the project, so as to update the schedule in time and achieve the purpose of controlling the schedule [10].…”
Section: Project Schedule Control Principlementioning
confidence: 99%
“…Project schedule control, like cost control and quality control, is one of the key control objects of the project and an important means to ensure that the project is completed on schedule, reasonably arrange resource allocation and control input costs. The progress control of the project lasts from the start of the project to the end of the project, which is a long-lasting and dynamic process management [8][9]. After completing the preparation of the project schedule, the actual project schedule fed back from the project construction is compared with the planned schedule, so as to clarify the progress speed of the project, so as to update the schedule in time and achieve the purpose of controlling the schedule [10].…”
Section: Project Schedule Control Principlementioning
confidence: 99%
“…Currently, none of the existing non-invasive technologies has adequate performance with respect to underlying false-positive and false-negative rates to function in such a role. We have previously hypothesized that a multiplexed combination of non-invasive technologies that incorporates anatomic and temporal patterns via machine learning may outperform existing solutions 9 and reported that such an approach had superior diagnostic performance 10 in a porcine model of occult hemorrhage 11 . In particular, we observed that direct change-from-baseline impedance measurements 12 and a multiplexed model built of absolute and impedance-change data appeared to have exceptional performances 9 .…”
Section: Introductionmentioning
confidence: 99%