15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel

Abstract: The Tulfes Pfons H33 construction contract of the Brenner Base Tunnel includes a 15 km long exploratory tunnel. The tunnel is being driven by an open gripper TBM, permitting a view of the surface of the rock mass, to achieve the best possible geological and geotechnical exploration for the deep tunnel system. Geologists and geotechnical engineers follow the TBM excavation on a daily basis and guarantee ongoing mapping and interpretation of the rock mass classification and of the TBM data. All data from the exp… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 3 publications
0
1
0
1
Order By: Relevance
“…Der kontinuierliche Vortrieb des Erkundungsstollens (EKS) mittels einer Offenen Gripper TBM-O (Bild 8) zwischen der Nothaltestelle Innsbruck (EKS km 6,9+22.688) und der Vortriebs-Losgrenze zum Baulos H51 (EKS km 23,5+50.140) wurde im September 2015 begonnen und im Juli 2020 beendet [3].…”
Section: Erkenntnisse Aus Dem Vortrieb Des Erkundungsstollens Im Baul...unclassified
See 1 more Smart Citation
“…Der kontinuierliche Vortrieb des Erkundungsstollens (EKS) mittels einer Offenen Gripper TBM-O (Bild 8) zwischen der Nothaltestelle Innsbruck (EKS km 6,9+22.688) und der Vortriebs-Losgrenze zum Baulos H51 (EKS km 23,5+50.140) wurde im September 2015 begonnen und im Juli 2020 beendet [3].…”
Section: Erkenntnisse Aus Dem Vortrieb Des Erkundungsstollens Im Baul...unclassified
“…The mechanical drive of the exploratory tunnel (EKS) using an open-gripper TBM (Fig. 8) between the Innsbruck emergency stop (EKS km 6.9+22.688) and boundary with the H51 (EKS km 23.5+50.140) construction lot started in September 2015 and was complete in July 2020 [3].…”
Section: Insights Gained From the Tunnel Drive Of The Exploratory Tun...mentioning
confidence: 99%