2017
DOI: 10.1002/cepa.481
|View full text |Cite
|
Sign up to set email alerts
|

16.24: Load‐carrying capacity of steel girder damaged by collision

Abstract: It happens sometimes that a truck running on a highway collides with the main girder of a bridge over the highway. The influence of the damage due to collision on the mechanical behavior of the bridge has to be evaluated for the safety of traffic on the bridge. Yet it is not always an easy task, since the mechanical capacity of a deformed girder has not been studied much. One of the authors has been involved in the safety evaluation of a steel girder bridge damaged by collision. The bridge consisted of two ste… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The reasons for the increase in permanent de ections are complex, and they can be due to overloading above the nominal load capacity that leads to lamellar crack propagation in the girder elements, which develop over time, and the ageing of the material [9]. The increase in permanent de ections exhausts the structure's load capacity and, at the same time, affects the proper operation of transport equipment due to the increasing resistance to their movement on the crane bridge and the crane roadway [10].…”
Section: Introductionmentioning
confidence: 99%
“…The reasons for the increase in permanent de ections are complex, and they can be due to overloading above the nominal load capacity that leads to lamellar crack propagation in the girder elements, which develop over time, and the ageing of the material [9]. The increase in permanent de ections exhausts the structure's load capacity and, at the same time, affects the proper operation of transport equipment due to the increasing resistance to their movement on the crane bridge and the crane roadway [10].…”
Section: Introductionmentioning
confidence: 99%