2024
DOI: 10.1088/1748-0221/19/11/t11005
|View full text |Cite
|
Sign up to set email alerts
|

160 kW beam commissioning for the Rapid Cycling Synchrotron of the China Spallation Neutron Source

Ming-Yang Huang,
Hanyang Liu,
Liangsheng Huang
et al.

Abstract: For the China Spallation Neutron Source (CSNS), the rapid cycling synchrotron (RCS) accumulates and accelerates the injection beam to the design energy of 1.6 GeV and then extracts the high energy beam to the target. In this paper, the 160 kW beam power commissioning for the CSNS RCS has been comprehensively studied, including: increase in the pulse width of the injection beam to optimize the transverse painting, commissioning of the two dual harmonic radio frequency (RF) cavities, optimization of the transver… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 10 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?