This article describes the general approach that was taken in integrating and system testing the 3B20D Processor system. Since both the system hardware and software were developed simultaneously, the goals of the system test and integration plan naturally shifted emphasis and expanded their scope from achieving hardware stability to establishing software functionality and finally to demonstrating system stability. This article also overviews some of the project management techniques and procedures applied during the development of the 3B20D Processor.