2001
DOI: 10.1023/a:1017591718463
|View full text |Cite
|
Sign up to set email alerts
|

Untitled

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
14
0

Year Published

2009
2009
2021
2021

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 108 publications
(14 citation statements)
references
References 1 publication
0
14
0
Order By: Relevance
“…Research works related to the range endpoints of the input parameter have begun, as Finnveden and Lindfors [50] carried out research on the range endpoints of the input parameter as minimum (x/factor) and maximum (x × factor) and the factor varied from 2 to 100 based on the "rule of thumb". In addition, Hedbrant and Sorme [51] proposed the ranges of the five data quality levels from x/1 to x × 10 related to the data collection in the heavy metal industry. Here, X is the amount of input parameter in the life cycle inventory and the factor was varied by the authors from 2 to 100.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Research works related to the range endpoints of the input parameter have begun, as Finnveden and Lindfors [50] carried out research on the range endpoints of the input parameter as minimum (x/factor) and maximum (x × factor) and the factor varied from 2 to 100 based on the "rule of thumb". In addition, Hedbrant and Sorme [51] proposed the ranges of the five data quality levels from x/1 to x × 10 related to the data collection in the heavy metal industry. Here, X is the amount of input parameter in the life cycle inventory and the factor was varied by the authors from 2 to 100.…”
Section: Discussionmentioning
confidence: 99%
“…In theory, the site-specific approach [50][51][52][53] is required for the uncertainty analysis of the IDEA; however, the collection of data, measurements, and specific statistical data of each parameter is not practical. From the comparative study of the uncertainty results with the stochastic modeling approach, alternative approach B was developed in this research.…”
Section: Discussionmentioning
confidence: 99%
“…(2) Parameter tables that include the nutrient content factors were formed from databases and literature [36][37][38][39]. (3) An uncertainty analysis was done for the individual SITC classes and the lower and upper bounds of nutrient content were formed [40,41]. (4) Confidence intervals for quantified nutrients were formed for the time series.…”
Section: Data and Calculation Methodsmentioning
confidence: 99%
“…The uncertainty for each basic heading was assessed based on the quality of each input data source. The data quality levels were formed as described by Hedbrant (2001) [40]. Each source value has uncertainties based on the source quality of the data, which were obtained by an individual assessment of values.…”
Section: Uncertainty Analysismentioning
confidence: 99%
See 1 more Smart Citation