2018
DOI: 10.1007/978-3-319-97115-5_19
|View full text |Cite
|
Sign up to set email alerts
|

3D Settlement Analysis of Underpinning Piles Under Raft Foundation Subjected to Nonuniform Vertical Loading

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…within the height range of the new basement should be chiseled out. e operation process is a dynamic construction process, in which the design of the vertical underpinning structure system is one of the key links in the top-down construction technology of existing buildings [6][7][8][9][10].…”
Section: Introductionmentioning
confidence: 99%
“…within the height range of the new basement should be chiseled out. e operation process is a dynamic construction process, in which the design of the vertical underpinning structure system is one of the key links in the top-down construction technology of existing buildings [6][7][8][9][10].…”
Section: Introductionmentioning
confidence: 99%