2009
DOI: 10.1007/s10749-010-0116-1
|View full text |Cite
|
Sign up to set email alerts
|

65-MW gas-turbine system for renovation of the Mosénergo TÉTs-9 heating and electric power plant

Abstract: Thermal layouts are examined for condensation-type steam-gas systems with one, two, and three boiler-utilizer pressure stages based on the GTÉ-65 gas-turbine power generating system and the PT 60-12.7/1.27 steam turbine. The operational efficiency and feasibility of integrating a GTÉ-65 and a Pr-86-13.72-545 boiler-utilizer with a single pressure stage in the existing thermal layout of the TÉTs-9 plant of Mosénergo (a station with crosslinks) within the main housing at the location of a no longer operating R-5… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?