Abstract:A recently introduced lot scheduling problem is considered. It is to find a partition of jobs of n orders into lots and to sequence these lots on a single machine so that the total average completion time of the orders is minimized. A simple O(n log n) time algorithm is presented for this problem in the literature, with a relatively sophisticated proof of its optimality. We show that modeling this problem as a classic batching machine problem makes its optimal solution obvious.
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.