A Case Study on Roundabout under Congestion: Proposal to Improve Current Traffic Operation

Abstract: Roundabouts are progressively being utilized on occupied arterial streets for traffic quieting purposes. Be that as it may, on the off chance that one indirect leg is close to a conveyance center point, for instance, stopping territories of strip malls, the passage traffic volumes will be especially high in pinnacle hours. On the basis of the Al-Turkman Roundabout, which is one of the most important roundabouts in Baghdad city, linking the areas of east of Baghdad to the city center in the area of Bab Al-Moath… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
5
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 5 publications
(7 reference statements)
1
5
0
Order By: Relevance
“…The total delay is 127.84veh-h/h, the average geometric delay is 2.7s/veh, and the average control delay of the roundabout is 57.2s/veh, thus the level of service for the roundabout is E according to the LOS categories of the software that are based on the SIDRA method. The LOS of four/five approach multi-lane roundabout suffering medium/high volumes and delays is ranging from E to F according to [10,13,22]. Regarding the performance of the Al-Jadriyah intersection, the maximum cycle time according to [23] (120s) was inputted to SIDRA Intersection.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…The total delay is 127.84veh-h/h, the average geometric delay is 2.7s/veh, and the average control delay of the roundabout is 57.2s/veh, thus the level of service for the roundabout is E according to the LOS categories of the software that are based on the SIDRA method. The LOS of four/five approach multi-lane roundabout suffering medium/high volumes and delays is ranging from E to F according to [10,13,22]. Regarding the performance of the Al-Jadriyah intersection, the maximum cycle time according to [23] (120s) was inputted to SIDRA Intersection.…”
Section: Resultsmentioning
confidence: 99%
“…Authors in [13] used SIDRA to evaluate LOS and delays of the Al-Turkman Roundabout in Baghdad to improve its performance by proposing planning procedures to address the traffic jam and congestion problems in this area. In [14], the authors studied the performance of two signalized intersections in Bangi, Malaysia using the SIDRA software.…”
Section: Introductionmentioning
confidence: 99%
“…Moreover, the degree of service at the intersection greatly impacts the road's total level of service [5]. Increasing the intersection's capacity is essential for expanding any road's carrying capacity.…”
Section: Original Researchmentioning
confidence: 99%
“…The camera has also protective cover, which protects camera lens against direct sunlight as well as bed weather conditions. The following Table 1 represents a matrix of traffic routing on the roundabout during the peak hour [1,2]. The most loaded entrance during a peak hour is the entrance number 3 with intensity of 1126 vehicles.…”
Section: Transport Survey On the Chosen Small Roundaboutmentioning
confidence: 99%
“…a. Passage time calculation -it is a time between the end of one signal phase and the beginning of incoming phase (1).…”
Section: Creating and Simulating Of Transport Environment In Transpor...mentioning
confidence: 99%