A Chance Constrained Transmission Network Expansion Planning Method With Consideration of Load and Wind Farm Uncertainties

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
176
0
2

Year Published

2012
2012
2021
2021

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 302 publications
(178 citation statements)
references
References 33 publications
0
176
0
2
Order By: Relevance
“…The operation costs contain the cost of power purchases from the grid (C grid ), cost of power purchases from DGs (C DG ), cost of compensation DGs (C payDG ) and cost of compensation ILs (C RL ). Chance constrained programming [26] is adopted to deal with the multi-state models of WT-PV outputs. CCP can be used to solve the optimization problem with uncertain factors under the given confidence level, which is suitable for solving the scheduling problem in this paper that takes the uncertain outputs of REGs into consideration.…”
Section: Initial Optimizationmentioning
confidence: 99%
See 1 more Smart Citation
“…The operation costs contain the cost of power purchases from the grid (C grid ), cost of power purchases from DGs (C DG ), cost of compensation DGs (C payDG ) and cost of compensation ILs (C RL ). Chance constrained programming [26] is adopted to deal with the multi-state models of WT-PV outputs. CCP can be used to solve the optimization problem with uncertain factors under the given confidence level, which is suitable for solving the scheduling problem in this paper that takes the uncertain outputs of REGs into consideration.…”
Section: Initial Optimizationmentioning
confidence: 99%
“…The outputs of controllable DGs and the exploitation of ILs in each period are optimized with an optimization objective of the operation costs of DISCOs, and CCP is employed to solve the multi-state models of WT-PV outputs. minF t 3 (26) The constraints are as follows: Probability constraint of the objective:…”
Section: Der Optimizationmentioning
confidence: 99%
“…Equation (14) expresses the amount of power to be exchanged between zones as a function of both price and voltage magnitudes. This is not economically desired or interpretable and is not consistent with the existing pricing mechanisms [17].…”
Section: B Static Transmission Planning Problem (Step)mentioning
confidence: 99%
“…The impacts of regulatory interventions on wind power expansion generation planning are investigated in [3]. The reliability of composite generation and transmission system with large-scale WG integration can be found in [4], and the effect of wind and load forecast errors on the power system expansion planning is presented in [5]. A simple approach using the annual load duration curve to evaluate the potential base and peak load savings by the installation of wind power has been presented by [6].…”
Section: Introductionmentioning
confidence: 99%