2008
DOI: 10.1016/j.jmsy.2009.02.001
|View full text |Cite
|
Sign up to set email alerts
|

A closed-loop control architecture for CAM accounting for shop floor uncertainties

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2012
2012
2020
2020

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…There are only a few research studies [1,3,6] that have looked into the modeling and operational characteristics of SLM. However, several global companies have recognized the importance of SLM and have started using and implementing the concept.…”
Section: A Simulation Lifecycle Management (Slm)mentioning
confidence: 99%
See 1 more Smart Citation
“…There are only a few research studies [1,3,6] that have looked into the modeling and operational characteristics of SLM. However, several global companies have recognized the importance of SLM and have started using and implementing the concept.…”
Section: A Simulation Lifecycle Management (Slm)mentioning
confidence: 99%
“…There are several existing efforts linking product designs and process modeling, some of which are listed here. In [3], Lee, et al, have combined design processes and manufacturing processes with checking shop floor's capability and uncertainties. A shop floor manufacturing simulation model is used to select the best performing design process among several alternative design processes.…”
Section: A Simulation Lifecycle Management (Slm)mentioning
confidence: 99%