2022 30th International Conference on Electrical Engineering (ICEE) 2022
DOI: 10.1109/icee55646.2022.9827325
|View full text |Cite
|
Sign up to set email alerts
|

A Comprehensive Deep Learning Method for Short-Term Load Forecasting

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 22 publications
0
1
0
Order By: Relevance
“…That is, when the two different blackout plans 0 r and 1 r meet at least one of the following logical rules, the two plans are considered to have the same stopping relationship and should be arranged at the same time outage: (1) the same equipment for the blackout of different plans should be arranged at the same time outage; (2) the equipment and its connected switches should be arranged at the same time outage; (3) the main transformer and its connected low-voltage side of the bus should be arranged at the same time outage; (4) buses and their connected loads should be arranged at the same time outage; (5) the line directly connected to the main transformer should be arranged at the same time outage [12][13][14].…”
Section: Research On the Intelligent Coordination Methods Based On Ex...mentioning
confidence: 99%
“…That is, when the two different blackout plans 0 r and 1 r meet at least one of the following logical rules, the two plans are considered to have the same stopping relationship and should be arranged at the same time outage: (1) the same equipment for the blackout of different plans should be arranged at the same time outage; (2) the equipment and its connected switches should be arranged at the same time outage; (3) the main transformer and its connected low-voltage side of the bus should be arranged at the same time outage; (4) buses and their connected loads should be arranged at the same time outage; (5) the line directly connected to the main transformer should be arranged at the same time outage [12][13][14].…”
Section: Research On the Intelligent Coordination Methods Based On Ex...mentioning
confidence: 99%