1996
DOI: 10.1057/ejis.1996.10
|View full text |Cite
|
Sign up to set email alerts
|

A contingency framework for the investigation of information systems failure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
52
0

Year Published

1997
1997
2015
2015

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 59 publications
(52 citation statements)
references
References 14 publications
0
52
0
Order By: Relevance
“…This means that government officials are much more concerned with policy agendasetting processes rather than management functions (Caudle et al, 1991). Contrary to the increasing sophistication of information technology, "information systems continue to fail either during development or at the points of implementation and use (Poulymenakou and Holmes, 1996). "…”
Section: Review Of the Prior Studiesmentioning
confidence: 99%
See 1 more Smart Citation
“…This means that government officials are much more concerned with policy agendasetting processes rather than management functions (Caudle et al, 1991). Contrary to the increasing sophistication of information technology, "information systems continue to fail either during development or at the points of implementation and use (Poulymenakou and Holmes, 1996). "…”
Section: Review Of the Prior Studiesmentioning
confidence: 99%
“…Otherwise, efforts on any front and inattention to other dimensions may end up in a mess or even if some achievement is obtained, it will be injustice not to think about the wastage caused by mismanagement. Research suggests that the discipline relating to the ITadoption process "still lacks the detailed understanding of the nature, issues and factors affecting failure which would enable us to capitalize from experience and suggest more appropriate courses of action (Poulymenakou and Holmes, 1996)." Careful initial planning is required to prevent the chances of huge costs after implementation because it has been found that visibility into the possibility of IT failure does not emerge until the project is well under way (Glass, 1998a).…”
Section: Introductionmentioning
confidence: 99%
“…In other instances, issues are not even considered until the system is fully developed; as Poulymenako and Holmes [34] Whilst this quotation adds further weight to the first proposition, there is also the possibility that issues are being treated by technical specialists, who are ill equipped to do so and thus the treatment is unlikely to be effective. The following hypothesis is therefore proposed:…”
Section: Theoretical Model and Research Hypothesesmentioning
confidence: 99%
“…Cooper (1994); Tolsby (1998) Impact on distribution of power Bloomfield & Coombs (1992); Poulymenakou and Holmes (1996). Note: a response of 1 indicates always, whilst a response of 5 indicates never Significant at the 1.0 % level;  2 = 12.67 > 11.34  2 (0.010), 3df.…”
Section: Transitional Issues (Ti)mentioning
confidence: 99%