1980
DOI: 10.2307/2346899
|View full text |Cite
|
Sign up to set email alerts
|

A Control Chart Based on Cumulative Scores

Abstract: Summary Process control schemes using a simple scoring system are presented for controlling the mean of a normal distribution in the one and two sided case. The average run lengths of the schemes are simpler to compute than those of cumulative sum schemes, and for small deviations in the process mean the schemes are considerably more sensitive than Shewhart schemes. Some examples and comparisons are given.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
26
0

Year Published

1982
1982
2008
2008

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 33 publications
(26 citation statements)
references
References 15 publications
0
26
0
Order By: Relevance
“…Sitter et al [1] derived the ANM for the SHDA method, and the ANM for the CUSCORE was given originally by Munford [15].…”
Section: Criteria For Determining the Design Parametersmentioning
confidence: 99%
“…Sitter et al [1] derived the ANM for the SHDA method, and the ANM for the CUSCORE was given originally by Munford [15].…”
Section: Criteria For Determining the Design Parametersmentioning
confidence: 99%
“…Recently, Radaelli (1992) discussed a very simple CUSUM-type chart, i.e. the CUSCORE chart, which was derived from a quality control scheme introduced by Munford (1980) for controlling processes with independent identically distributed normal data.…”
Section: Introductionmentioning
confidence: 99%
“…3, (4)], and showed that it has much better performance than the original version. Munford (1980) proposcd a cumulative scoring scheme in which a score of -1, +1 or 0 is assigned to each sample mean depending on whether the sampie mean lies below, above or within the interval (7 -L,F + L), respectively. The Downloaded by [University of Chicago Library] at 12:17 08 December 2014 scheme will issue a warning signal as soon as the accumulated score reaches a criticai vaiue, h .…”
mentioning
confidence: 99%