2021
DOI: 10.1016/j.comcom.2021.08.014
|View full text |Cite
|
Sign up to set email alerts
|

A data-driven intelligent planning model for UAVs routing networks in mobile Internet of Things

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
29
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 79 publications
(29 citation statements)
references
References 24 publications
0
29
0
Order By: Relevance
“…e complexity of the transformation matrix is related to transformation steps, that is, the more steps, the more transformation matrix, which can produce the transformation of the complex graph [39,40].…”
Section: Discussionmentioning
confidence: 99%
“…e complexity of the transformation matrix is related to transformation steps, that is, the more steps, the more transformation matrix, which can produce the transformation of the complex graph [39,40].…”
Section: Discussionmentioning
confidence: 99%
“…At the last edition of the competition in 2017, ImageNet announced the end of a large vision challenge based on this dataset and will henceforth work on solving unsolved vision challenges. In this competition, SENet took the top spot in this image recognition with a top-5 error rate of 2.25%, which has far surpassed human ability and shows the maturity of image recognition technology [ 4 ].…”
Section: Introductionmentioning
confidence: 99%
“…These advantages will be an innovation in the construction safety evaluation of high-rise buildings. Its superiority lies in overcoming the defects of the old safety evaluation method, bringing a new evaluation data processing mode, and bringing accuracy and speed into the results of high-rise building construction safety evaluation [ 10 , 11 ]. Secondly, through the research on the relevant content of the safety evaluation theory, the shortcomings of the commonly used evaluation methods are analyzed, and the safety evaluation research of high-rise building construction based on fuzzy mathematics is established.…”
Section: Introductionmentioning
confidence: 99%