2022
DOI: 10.3390/en15218007
|View full text |Cite
|
Sign up to set email alerts
|

A Data Preprocessing Based on Cluster and Testing of Parameter Identification Method in Power Distribution Network

Abstract: We present a data prepossessing method for parameter identification based on clustering and hypothesis testing in a power distribution network to successfully achieve a more accurate result. This method considers the similarities of data in both spatial relationship and statistical theory, then builds a sophisticated data processing method to improve the performance of dynamic model-based parameter identification models, i.e., Markov chain Monte Carlo and sequential model-based global optimization. We applied … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 10 publications
0
3
0
Order By: Relevance
“…Other recent studies also have proposed the prediction results with the same metrics and the same dataset in this paper, such as the methods of MCMC and SMBO combined with clustering and hypothesis testing (denoted as MCMC C and SMBO C ). Li et al [32] published the best results of MAE values of MCMC C and SMBO C being 62.467 ± 0.366 and 61.868 ± 0.322, respectively. In another paper [31], the values of MAE computed by MCMC C and SMBO C are 62.136 ± 0.336 and 61.268 ± 0.311, respectively.…”
Section: Resultsmentioning
confidence: 98%
See 2 more Smart Citations
“…Other recent studies also have proposed the prediction results with the same metrics and the same dataset in this paper, such as the methods of MCMC and SMBO combined with clustering and hypothesis testing (denoted as MCMC C and SMBO C ). Li et al [32] published the best results of MAE values of MCMC C and SMBO C being 62.467 ± 0.366 and 61.868 ± 0.322, respectively. In another paper [31], the values of MAE computed by MCMC C and SMBO C are 62.136 ± 0.336 and 61.268 ± 0.311, respectively.…”
Section: Resultsmentioning
confidence: 98%
“…Te fundamental principles of PDN analysis can be found in references [20,[31][32][33]. To streamline the computational process, the assumption of balanced three-phase condition is made as a prerequisite for power fow calculations in this work.…”
Section: Power Flow Model Calculationmentioning
confidence: 99%
See 1 more Smart Citation