2023
DOI: 10.1016/j.scs.2023.104795
|View full text |Cite
|
Sign up to set email alerts
|

A digital twin architecture for real-time and offline high granularity analysis in smart buildings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
1
0

Year Published

2024
2024
2025
2025

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 23 publications
(3 citation statements)
references
References 47 publications
0
1
0
Order By: Relevance
“…In [125] the authors point out the two most important differences between DT and BIM, namely (i) the BIM was designed to improve the efficiency of design and construction, and still is used in these processes, but the DT is designed to monitor physical assets and improve their operational efficiency and provide predictive maintenance and (ii) the BIM was not designed to work with real-time data; therefore, it is used for design and construction facility management, whereas the DT is a dynamic environment, with support for real-time data and ML and AI. Moreover, in [127], Hadjidemetriou et al describe building DT architecture separating four phases:…”
Section: Tactile Internet and Digital Twins With Distributed Automati...mentioning
confidence: 99%
“…In [125] the authors point out the two most important differences between DT and BIM, namely (i) the BIM was designed to improve the efficiency of design and construction, and still is used in these processes, but the DT is designed to monitor physical assets and improve their operational efficiency and provide predictive maintenance and (ii) the BIM was not designed to work with real-time data; therefore, it is used for design and construction facility management, whereas the DT is a dynamic environment, with support for real-time data and ML and AI. Moreover, in [127], Hadjidemetriou et al describe building DT architecture separating four phases:…”
Section: Tactile Internet and Digital Twins With Distributed Automati...mentioning
confidence: 99%
“…The third phase involves the actual scanning of the building. If 2D drawings are available in any computer-aided design software, for example, AutoCAD, these could be imported to the BIM software application Autodesk Revit, to create a digital 3D geometry (Hadjidemetriou et al, 2023). For this case, where the geometry must be re-established, a scanning technology was utilized.…”
Section: The Model Generation Phasementioning
confidence: 99%
“…Buildings worldwide consume a significant amount of electricity and contribute greatly to Greenhouse Gas (GHG) emissions, making them vital in the pursuit of environmental sustainability. They account for about 55% of global electricity usage and contribute to 28% of the CO2 emissions from energy consumption worldwide [129], [143]. Moreover, people tend to spend much of their time in indoor built environments.…”
Section: Introductionmentioning
confidence: 99%