1988
DOI: 10.1080/00207548808947919
|View full text |Cite
|
Sign up to set email alerts
|

A dynamic job-assignment policy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2005
2005
2020
2020

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…Various performance measures of the job shop have been examined using different loading rules (Muhlemann et al, 1982). An unbalanced line tends to have underutilized operators and workstations along with high work in process (WIP) (Chow, 1988). In both conventional and flexible manufacturing systems, workload balancing attempts to equalize the workload of the operations assigned to each machine (Farkas et al, 1999).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Various performance measures of the job shop have been examined using different loading rules (Muhlemann et al, 1982). An unbalanced line tends to have underutilized operators and workstations along with high work in process (WIP) (Chow, 1988). In both conventional and flexible manufacturing systems, workload balancing attempts to equalize the workload of the operations assigned to each machine (Farkas et al, 1999).…”
Section: Literature Reviewmentioning
confidence: 99%