2001
DOI: 10.1097/00000539-200104000-00021
|View full text |Cite
|
Sign up to set email alerts
|

A Failure of the Chain-Link Mechanism on the Ohmeda Excel 210 Anesthetic Machine

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2002
2002
2013
2013

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…Fault in the chain-link mechanism of Ohmeda Excel 210 SE where loosening of the stop screw which placed over the O 2 flow control knob contributed to hypoxic gas delivery. [121314] Faulty interface between gear wheels of O 2 and N 2 O flow meters in ageing machines contributed to failure of the flow proportionating devices while defective rubber seal of flow meter control tube was responsible for hypoxic gas delivery. [1516]…”
Section: Hazards Of Anaesthesia Machinesmentioning
confidence: 99%
“…Fault in the chain-link mechanism of Ohmeda Excel 210 SE where loosening of the stop screw which placed over the O 2 flow control knob contributed to hypoxic gas delivery. [121314] Faulty interface between gear wheels of O 2 and N 2 O flow meters in ageing machines contributed to failure of the flow proportionating devices while defective rubber seal of flow meter control tube was responsible for hypoxic gas delivery. [1516]…”
Section: Hazards Of Anaesthesia Machinesmentioning
confidence: 99%