TENCON 2021 - 2021 IEEE Region 10 Conference (TENCON) 2021
DOI: 10.1109/tencon54134.2021.9707365
|View full text |Cite
|
Sign up to set email alerts
|

A Fair Allocation Method of Curtailed Power for Wind Farms Considering Transmission Line Capacity and Conditions for Fair Allocation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 8 publications
0
5
0
Order By: Relevance
“…[7] and Ref. [10] is used in a day ahead supply–demand planning implemented by the TSO in order to determine the output limits during the time period when output curtailment is necessary. In the method, the Fundamental Problem is solved to determine the WF output limits over 24 h using the prediction data of WF output and the demand for the next day.…”
Section: Fundamental Problem For Output Limit Determinationmentioning
confidence: 99%
See 4 more Smart Citations
“…[7] and Ref. [10] is used in a day ahead supply–demand planning implemented by the TSO in order to determine the output limits during the time period when output curtailment is necessary. In the method, the Fundamental Problem is solved to determine the WF output limits over 24 h using the prediction data of WF output and the demand for the next day.…”
Section: Fundamental Problem For Output Limit Determinationmentioning
confidence: 99%
“…x opt i * is a variable which includes the effect of additional charge power of EVs, P EV k (t c ) in (10). ii Conditions with respect to power flows Solve Fundamental Problem.…”
Section: Formulation Of the Dr Amount Problemmentioning
confidence: 99%
See 3 more Smart Citations