2020
DOI: 10.1109/tsg.2019.2926205
|View full text |Cite
|
Sign up to set email alerts
|

A Fast Load Control System Based on Mobile Distribution-Level Phasor Measurement Unit

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
28
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
3
3

Relationship

4
6

Authors

Journals

citations
Cited by 73 publications
(28 citation statements)
references
References 29 publications
0
28
0
Order By: Relevance
“…For example, using µPMU data, reverse power flow in distribution networks can be easily detected [27]. Upon detection of distribution system frequency event, power mismatch between generation and load demand which can be caused by power system disturbances is estimated at the early stage of the event [28].…”
Section: Monitoring and Diagnostic Applicationsmentioning
confidence: 99%
“…For example, using µPMU data, reverse power flow in distribution networks can be easily detected [27]. Upon detection of distribution system frequency event, power mismatch between generation and load demand which can be caused by power system disturbances is estimated at the early stage of the event [28].…”
Section: Monitoring and Diagnostic Applicationsmentioning
confidence: 99%
“…Recommendations. With the increasing integration of renewable energy sources [34], the impact of the power electronic converters should be considered in future analysis. Many research studies have been carried out to investigate the stability issues for the power system with converters [35][36][37].…”
Section: Additional Pointsmentioning
confidence: 99%
“…The displacement of synchronous generators with PV has direct impacts on the system inertia level and frequency regulation capability. Many power systems starts to notice the risks of insufficient system inertia and frequency regulation resources due to the increase of PV and other nonsynchronous renewable generation [16][17][18][19][20][21][22][23][24][25][26][27][28][29][30], largely thanks to the deployment of wide-area synchrophasor measurement systems .…”
Section: Introductionmentioning
confidence: 99%