2016
DOI: 10.4314/wsa.v42i4.03
|View full text |Cite
|
Sign up to set email alerts
|

A feasibility and implementation model of small-scale hydropower development for rural electrification in South Africa: A case study of Kwa Madiba SSHP Plant

Abstract: Large numbers of households and communities will not be connected to the national electricity grid for the foreseeable future due to high cost of transmission and distribution systems to remote communities and the relatively low electricity demand within rural communities. Small-scale hydropower used to play a very important role in the provision of energy to urban and rural areas of South Africa. The national electricity grid, however, expanded and offered cheap, coalgenerated electricity and a large number o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…From an economic standpoint, the exploitation of hydropower sites highly depends on their economic feasibility. The latter, is consequently dependent on the seasonality of water resources, estimated electricity production, supply chains and technology availability, infrastructure to reach the desired load, power purchase agreements and deployment schemes (e.g., tariffs, taxation) among others [70,[77][78][79]. The average installation costs in the region stand at 3000 $/kW; capacity factors reach 57% and generating costs (lcoe) average at 0.06 $/kWh [80].…”
Section: Discussionmentioning
confidence: 99%
“…From an economic standpoint, the exploitation of hydropower sites highly depends on their economic feasibility. The latter, is consequently dependent on the seasonality of water resources, estimated electricity production, supply chains and technology availability, infrastructure to reach the desired load, power purchase agreements and deployment schemes (e.g., tariffs, taxation) among others [70,[77][78][79]. The average installation costs in the region stand at 3000 $/kW; capacity factors reach 57% and generating costs (lcoe) average at 0.06 $/kWh [80].…”
Section: Discussionmentioning
confidence: 99%