2021
DOI: 10.3390/mining1010005
|View full text |Cite
|
Sign up to set email alerts
|

A Framework for Open-Pit Mine Production Scheduling under Semi-Mobile In-Pit Crushing and Conveying Systems with the High-Angle Conveyor

Abstract: In-pit crushing and conveying (IPCC) systems have drawn attention to the modern mining industry due to the numerous benefits than conventional truck-and-shovel systems. However, the implementation of the IPCC system can reduce mining flexibility and introduce additional mining sequence requirements. This paper investigates the long-term production scheduling and the crusher relocation plan of open-pit mines using a semi-mobile IPCC system and high-angle conveyor. A series of candidate high-angle conveyor locat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 16 publications
0
2
0
1
Order By: Relevance
“…A framework for simultaneous optimisation of long-term mine scheduling with SMIPCC was developed by Liu and Pourrahimian (2021). The authors proposed an integer linear programming model that maximises NPV by maximising block values and minimising haulage and crusher relocation cost.…”
Section: Simultaneous Optimisation Of Ipcc and Mine Planmentioning
confidence: 99%
See 1 more Smart Citation
“…A framework for simultaneous optimisation of long-term mine scheduling with SMIPCC was developed by Liu and Pourrahimian (2021). The authors proposed an integer linear programming model that maximises NPV by maximising block values and minimising haulage and crusher relocation cost.…”
Section: Simultaneous Optimisation Of Ipcc and Mine Planmentioning
confidence: 99%
“…The comparisons among the most recent short-term planning and IPCC literature show that while very few models can generate a strategic plan with IPCC in place, such as Paricheh and Osanloo (2019a), Samavati et al (2020), Shamsi et al (2022), Liu and Pourrahimian (2021), etc., there is hardly any short-term planning model with IPCC integration. To make things worse, no study can help mine planners estimate the cost of IPCC systems in a systematic manner considering all the variables and uncertainties associated with it.…”
Section: Future Research Directionmentioning
confidence: 99%
“…Opsi lain yang dapat digunakan adalah menerapkan bahasa pemrograman. Cara ini umumnya digunakan pada tahap pengembangan dan diterapkan pada studi kasus yang spesifik (Buelga Díaz et al, 2021;Choi et al, 2022;Liu & Pourrahimian, 2021;Nancel-Penard et al, 2022;Nancel-penard & Morales, 2021;Sattarvand, 2009;Tian et al, 2021;Tolouei et al, 2021;Vu et al, 2021). Walaupun cara ini cenderung fleksibel, namun keterampilan penggunaan bahasa pemrograman merupakan persyaratan yang kebanyakan tidak dimiliki semua orang khususnya pada bidang pertambangan.…”
unclassified