2021
DOI: 10.1016/j.jmsy.2021.08.008
|View full text |Cite
|
Sign up to set email alerts
|

A fuzzy hierarchical reinforcement learning based scheduling method for semiconductor wafer manufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2025
2025

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 15 publications
(2 citation statements)
references
References 34 publications
0
2
0
Order By: Relevance
“…Cluster tools are highly automated and integrated equipment that are broadly applied in wafer fabrication processes [13], [14]. To effectively improve the production efficiency and yield rate of wafers, many scholars have extensively investigated these problems regarding the scheduling and control of single-armed cluster tools with different constraints.…”
Section: ) Scheduling Analysis and Optimizing Of Cluster Toolsmentioning
confidence: 99%
See 1 more Smart Citation
“…Cluster tools are highly automated and integrated equipment that are broadly applied in wafer fabrication processes [13], [14]. To effectively improve the production efficiency and yield rate of wafers, many scholars have extensively investigated these problems regarding the scheduling and control of single-armed cluster tools with different constraints.…”
Section: ) Scheduling Analysis and Optimizing Of Cluster Toolsmentioning
confidence: 99%
“…Thus, the vibration angular displacement θ10 , θ20 , θ30 at the end moment of braking process of the torsional vibration system can be calculated by (14). Obviously, the greater the acceleration of the braking process of the torsional vibration system, the greater the inertial force F I of the system, which leads to the greater the vibration angular displacements θ10 , θ20 , θ30 of the torsional vibration system of manipulator.…”
Section: Vibration Attenuation Characteristicsmentioning
confidence: 99%