1999
DOI: 10.1016/s0007-8506(07)63204-1
|View full text |Cite
|
Sign up to set email alerts
|

A Genetic Algorithm Based Approach for Scheduling of Dual-Resource Constrainded Manufacturing Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 25 publications
(4 citation statements)
references
References 9 publications
0
4
0
Order By: Relevance
“…Huang et al Engineering and Operations Management, Melbourne, Australia, November 14-16, 2023 © IEOM Society International (2014) worked on scheduling the optimization strategy for dual-resource job-shop scheduling (DR-JSP) with heterogeneous workers by using a pheromone branch genetic algorithm. Elmaraghy et al (1999) applied the genetic algorithm to compare various rules and heuristics in machine and worker assignments and schedules for DR-JSP and JSP. Chaudhry and Drake (2009) gave a generalized GA implementation for DR-JSP for identical parallel machines and worker assignments.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Huang et al Engineering and Operations Management, Melbourne, Australia, November 14-16, 2023 © IEOM Society International (2014) worked on scheduling the optimization strategy for dual-resource job-shop scheduling (DR-JSP) with heterogeneous workers by using a pheromone branch genetic algorithm. Elmaraghy et al (1999) applied the genetic algorithm to compare various rules and heuristics in machine and worker assignments and schedules for DR-JSP and JSP. Chaudhry and Drake (2009) gave a generalized GA implementation for DR-JSP for identical parallel machines and worker assignments.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Before year 2000, various issues on dual resource-constrained (DRC) systems have been studied, such as resource flexibility in job shops (Bobrowski & Park, 1993;Fry et al, 1995), workforce flexibility and learning effect (Malhotra et al, 1993), workforce flexibility in cellular manufacturing systems (CMS) (Morris & Tersine, 1994), and workforce assignment in job shop scheduling problems (Liao & Lin, 1998;ElMaraghy et al, 1999). These publications were already analyzed in the survey (Xu et al, 2011).…”
Section: Dual Resource Constrained (Drc) Systemmentioning
confidence: 99%
“…The method included random input turbulences, multiple criteria and multiple job routes. A scheduling approach was developed in [11] using a GA, to determine the efficient assignment of machines and workers in order to optimize performance criteria such as the mean flow time. The problem of scheduling of a Flexible Manufacturing System using a GA with knowledge based genetic operators is included in [12].…”
Section: State Of the Artmentioning
confidence: 99%