A Genetic Algorithm Based Optimal Sizing Strategy for PV/Battery/Hydrogen Hybrid System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 23 publications
0
7
0
Order By: Relevance
“…Higher reliability factors and economic benefits are considered to be important constraints for optimal battery sizing. In [18], a Genetic Algorithm (GA) was used for optimal sizing of the battery [18]. The main objectives of this research were to decrease the Net Present Cost (NPC) of the system and the consideration of the Equivalent Loss Factor for the index amount of reliability.…”
Section: Related Workmentioning
confidence: 99%
“…Higher reliability factors and economic benefits are considered to be important constraints for optimal battery sizing. In [18], a Genetic Algorithm (GA) was used for optimal sizing of the battery [18]. The main objectives of this research were to decrease the Net Present Cost (NPC) of the system and the consideration of the Equivalent Loss Factor for the index amount of reliability.…”
Section: Related Workmentioning
confidence: 99%
“…In research done by Nouhaila Lazaar, the Genetic Algorithm (GA) was used for optimal sizing of the battery [16]. The main objectives for this research done by Nouhaila was to decrease the Net Present Cost (NPC) of the system and the consideration of the Equivalent Loss Factor (ELF) for the index amount of reliability.…”
Section: Related Workmentioning
confidence: 99%
“…P j is the rated power of each component. In order to convert the replacement cost of a component at the end of its lifetime to present cost, K j is used; it can be calculated by (10) [25].…”
Section: A Proposed Objective Functionmentioning
confidence: 99%
“…PWA(. , R) is used to estimate the present value of maintenance and operation annual cost over the project lifetime, it is given by (11) [25].…”
Section: A Proposed Objective Functionmentioning
confidence: 99%