2008 Euromicro Conference on Real-Time Systems 2008
DOI: 10.1109/ecrts.2008.25
|View full text |Cite
|
Sign up to set email alerts
|

A Gravitational Task Model for Target Sensitive Real-Time Applications

Abstract: The commonly used task models for real - Results from a simulation study show the effectiveness of the approach.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0

Year Published

2009
2009
2024
2024

Publication Types

Select...
3
3

Relationship

2
4

Authors

Journals

citations
Cited by 11 publications
(6 citation statements)
references
References 11 publications
0
6
0
Order By: Relevance
“…The developer can decide among different scheduling algorithms, as fixed priorities (FPs) and earliest deadline first (EDF) [17]. To test the system near the limit conditions, the period of task 1 has been set to the maximum value allowed by Equation (13), that is…”
Section: Software Implementationmentioning
confidence: 99%
See 1 more Smart Citation
“…The developer can decide among different scheduling algorithms, as fixed priorities (FPs) and earliest deadline first (EDF) [17]. To test the system near the limit conditions, the period of task 1 has been set to the maximum value allowed by Equation (13), that is…”
Section: Software Implementationmentioning
confidence: 99%
“…To schedule overlapping events generated around the same target time, Guerra and Fohler [13,14] presented an algorithm based on gravitational field. In their approach, every task is considered as a mass denoting a different importance level, free to oscillate on a pendulum hanged at the desired target time.…”
Section: Introductionmentioning
confidence: 99%
“…The presence of non-preemptive regions in the task code, however, creates a potential blocking time (δ) to higher priority tasks that need to be taken into account in the feasibility analysis, as shown in Section III. This also affects the bounds for the safety region, because δ has to be added to ε t in Equation (12), so ∆θ max becomes:…”
Section: ) Estimating the Target Velocitymentioning
confidence: 99%
“…Guerra and Fohler [12], [11] proposed a gravitational model to schedule overlapping events around the same time instant. To do that, each task is assigned a different importance value, considered as a mass hanging on a pendulum centered at the desired time and used to compute the mass distribution along the timeline based on the equilibrium state.…”
Section: Introductionmentioning
confidence: 99%
“…In this paper we present a novel task model, called gravitational task model (Guerra and Fohler 2008), which is based on a physical system: the pendulum. A pendulum is an object that is attached to a pivot point and can swing freely.…”
mentioning
confidence: 99%