2022
DOI: 10.3390/en15031060
|View full text |Cite
|
Sign up to set email alerts
|

A Grid-Connected Microgrid Model and Optimal Scheduling Strategy Based on Hybrid Energy Storage System and Demand-Side Response

Abstract: The power gap between supply and demand in the microgrid caused by the uncertainty of wind and solar output and users’ electricity consumption needs to be absorbed by the hybrid energy storage devices and the demand-side electricity price response. To maximize the service life of the lithium battery pack, this paper optimizes a reasonable ratio of the supercapacitor pack’s daily charge and discharge times to the daily cycle times of the lithium battery pack. The model construction includes two parts: power pre… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 19 publications
0
2
0
Order By: Relevance
“…The difficulty of BESS sizing and estimating the costs of such networks is related to the stochastic nature of renewable energy generation and abrupt load fluctuations [16]. At the same time, not enough research has been devoted to the issue of developing a model for optimal BESS sizing that would take into account the rate of battery storage degradation [17]. In some cases, the battery lifetime may differ considerably from the manufacturer's stated lifetime due to different conditions of battery operation.…”
Section: Research Problem Statementmentioning
confidence: 99%
“…The difficulty of BESS sizing and estimating the costs of such networks is related to the stochastic nature of renewable energy generation and abrupt load fluctuations [16]. At the same time, not enough research has been devoted to the issue of developing a model for optimal BESS sizing that would take into account the rate of battery storage degradation [17]. In some cases, the battery lifetime may differ considerably from the manufacturer's stated lifetime due to different conditions of battery operation.…”
Section: Research Problem Statementmentioning
confidence: 99%
“…FIGURE 5General-topology diagram for (A) buck-boost converter-based charge controller. (B) Energy dispatch scheduling of grid-connected solar PV system with battery storage(Jing et al, 2022). (C) Ideal charging and discharging schedule for a hybrid PV-battery system(Kapoor and Sharma, 2020).…”
mentioning
confidence: 99%