A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setups

Abstract: Correct formulation of the master production schedule is critically important for the optimization of the management ofa production planning and control system. Most of the models described in the literature solve the problem in two separate sequential stages: lot sizing and then sequencing. This often produces an MPS which is not optimized or even not feasible. On the other hand, when the problem is tackled with models based on mixed integer linear programming, then dimensional constraints have to be respecte… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

1999
1999
2010
2010

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
references
References 5 publications
0
0
0
Order By: Relevance