2016
DOI: 10.1016/j.ymssp.2015.08.015
|View full text |Cite
|
Sign up to set email alerts
|

A hybrid algorithm combining EKF and RLS in synchronous estimation of road grade and vehicle׳ mass for a hybrid electric bus

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
30
0
4

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 77 publications
(34 citation statements)
references
References 27 publications
0
30
0
4
Order By: Relevance
“…Figure 8, we can see that the estimates capture the given actual mass for three different cases. Hence, compared to estimation mechanisms in other existing approaches [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15], it is of tremendous benefit to predict the unknown mass, without perceiving the information of a road grade. Furthermore, Figure 9 shows the estimation results of unloaded truck based on two different actual field test datasets.…”
Section: Vehicle Mass Estimation Using the Characteristics Of Engine mentioning
confidence: 99%
See 1 more Smart Citation
“…Figure 8, we can see that the estimates capture the given actual mass for three different cases. Hence, compared to estimation mechanisms in other existing approaches [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15], it is of tremendous benefit to predict the unknown mass, without perceiving the information of a road grade. Furthermore, Figure 9 shows the estimation results of unloaded truck based on two different actual field test datasets.…”
Section: Vehicle Mass Estimation Using the Characteristics Of Engine mentioning
confidence: 99%
“…To further improve the accuracy and robustness of the mass estimation, a torque observer was also applied into the system [7]. Moreover, in the literature [8][9][10][11][12][13], many have studied the method, simultaneously estimating the mass and road grade. Furthermore, reference [14] used an extended KF to estimate both mass and road grade.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, similar to the design principle of the transmission system and the traditional city buses are judged the maximum speed, climbing ability, the ability to accelerate according to these three indicators. Reference of traditional city bus standard, determine the hybrid electric bus and the dynamic indicators and economic indicators of the following: a top speed of 70km/h, or 0 to 50 km/h speed up 30 s or less time, maximum gradability is more than or equal to 20% [1], [7].…”
Section: The Establishment Of Simulation Modelmentioning
confidence: 99%
“…Many scholars simultaneously estimate the mass and road grade [11][12][13][14][15]. Vahidi [16,17] designed the RLS with multiple forgetting factors to account for different rates of change of different parameters, thus enabling the simultaneous estimation of the time-varying grade and piece-wise constant mass.…”
Section: Introductionmentioning
confidence: 99%