“…In our previous research [
22], a hybrid PV separation method was designed to obtain the behind‐the‐meter PV generation from the net load on the grid side, see Equation ().
where P PV ( t ) is BTM PV generation in time period t , P net ( t ) is the measured load at the grid supply point.…”