2017
DOI: 10.1299/transjsme.16-00333
|View full text |Cite
|
Sign up to set email alerts
|

A hybrid metaheuristic for scheduling problem in sheet metal processing

Abstract: In recent years, manufacturing industries are required to provide various kinds of products in a short time while reducing burden on the environment. To achieve such requirement, optimization techniques incorporated with ICT are attracting a rising attention. In sheet metal processing, reducing wastes of material and managing production schedule are considered to be very important for the efficient manufacturing. To work with these problems, we attempt to simultaneously minimize wastes of material and total ta… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…The equation (7) shows that operation time PT p k j of part j of order p is decided based on set-up time MT kl and operation time t kl of the lot that part j belongs to. Decision variable y p kl j denotes if part j of order p is batched into lot l at process k. Z kml ′ shows the processing sequence between lot l ′ and lot l on machine m in process k, and can be used to calculate set-up times as shown in equation (6).…”
Section: Model Of Batching and Schedulingmentioning
confidence: 99%
See 1 more Smart Citation
“…The equation (7) shows that operation time PT p k j of part j of order p is decided based on set-up time MT kl and operation time t kl of the lot that part j belongs to. Decision variable y p kl j denotes if part j of order p is batched into lot l at process k. Z kml ′ shows the processing sequence between lot l ′ and lot l on machine m in process k, and can be used to calculate set-up times as shown in equation (6).…”
Section: Model Of Batching and Schedulingmentioning
confidence: 99%
“…al. [6] have proposed a hybrid heuristic approach to the scheduling problem of sheet metal processing, which genetic algorithm, dispatching rule and local search technique are applied to create a schedule together with a bottom left algorithm for nesting. Toyoda [7], [8] made a revision to first-fit algorithm and proposed a new heuristic solution method for multiple stock length CSP.…”
Section: Introductionmentioning
confidence: 99%