2019
DOI: 10.1016/j.est.2019.100812
|View full text |Cite
|
Sign up to set email alerts
|

A hybrid storage-wind virtual power plant (VPP) participation in the electricity markets: A self-scheduling optimization considering price, renewable generation, and electric vehicles uncertainties

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
43
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 101 publications
(43 citation statements)
references
References 33 publications
0
43
0
Order By: Relevance
“…The generators' minimum online/offline periods are considered by (3) and 4, and also upward/downward ramp rate limits are reflected by (5) and (6). Constraint 7calculates the total production of each generator, and generation limits are presented by (8) and (9). The hourly required reserves of generators in upward and downward are calculated by (10) and (11), while the corresponding upper bounds are limited by the ramp rates.…”
Section: E E En Nv VI Ir Ron Nm Men Ntal L I Issues S S Environmentalmentioning
confidence: 99%
“…The generators' minimum online/offline periods are considered by (3) and 4, and also upward/downward ramp rate limits are reflected by (5) and (6). Constraint 7calculates the total production of each generator, and generation limits are presented by (8) and (9). The hourly required reserves of generators in upward and downward are calculated by (10) and (11), while the corresponding upper bounds are limited by the ramp rates.…”
Section: E E En Nv VI Ir Ron Nm Men Ntal L I Issues S S Environmentalmentioning
confidence: 99%
“…However, [33,34] did not include BM, bilateral contracts, risk management, portfolio structure, and line capacities. Alahyari et al [35] suggested an approach for virtual power plants with a WPP and EVPL to participate in the DA market and reserve market. Moreover, it should be noted that BM, bilateral contracts, and line capacities were not considered in the mentioned study.…”
Section: Relevant Backgroundmentioning
confidence: 99%
“…(34) that the state-of-energy expression of EVs at each time period t is equal to the sum of the state-of-energy at the time (t − 1) and the energy charged at the time interval t and (t − 1) . The fact that the state-of-energy of EV batteries is equal to or less than the maximum allowed energy limits when charging batteries is ensured by (35)…”
Section: Armentioning
confidence: 99%
“…For the sake of reproducibility, detailed data for the test systems can be downloaded from [38]. Other necessary input data are reported in Table 1 where load shedding cost data is according to [39], wind curtailment is considered to be a small value in comparison with average electricity price as the wind generation belongs to VPP itself, and charging/discharging efficiencies are considered the same for all EVs [40]. Tests were run utilising general algebraic modelling system and Matlab software on a Xeon E5-2680 processor at 2.5 GHz and 128 GB of RAM.…”
Section: Numerical Studiesmentioning
confidence: 99%