2019
DOI: 10.1016/j.aei.2018.11.005
|View full text |Cite
|
Sign up to set email alerts
|

A knowledge discovery and reuse method for time estimation in ship block manufacturing planning using DEA

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
2

Year Published

2019
2019
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 26 publications
0
2
0
2
Order By: Relevance
“…Data mining adalah proses pengolahan data dengan menggunakan algoritma yang mengikuti alur data mining. Algoritma K-Means Clustering digunakan dalam penelitian ini (Li et al, 2019).…”
Section: Data Miningunclassified
See 1 more Smart Citation
“…Data mining adalah proses pengolahan data dengan menggunakan algoritma yang mengikuti alur data mining. Algoritma K-Means Clustering digunakan dalam penelitian ini (Li et al, 2019).…”
Section: Data Miningunclassified
“…Langkah Knowledge ini menyajikan data yang dibuat oleh proses pengelompokan; fase ini memberikan hasil dalam format yang dapat dimengerti (Li et al, 2019).…”
Section: Knowledgeunclassified
“…Based on the previous study [42], the measured data access and the forecasted data output are additional elements in the work hours forecasting framework, as shown in Figure 8. The measured data from the data acquisition layer of the DT framework is input to the work hours quota database and the process route database, and K-means-based clustering analysis of welding processes is performed according to the operational characteristics to evaluate the work hours quotas according to the classification of different types of welding processes with various difficulties.…”
Section: Work Hours Forecastingmentioning
confidence: 99%
“…Mao et al (2020) presented an agent-based framework for collaborative planning and scheduling in shipbuilding projects. Other studies focused on improving time estimation precision(Li et al, 2019), shipbuilding block assembly line scheduling(Cho et al, 2022), and large-scale shipyard scheduling problems(Han et al, 2017). Jeong et al(2018) proposed efficient spatial arrangement planning for shipyards, while Ge & Wang (2021) addressed block spatial scheduling optimization and scheduling strategies for irregular curved blocks.…”
mentioning
confidence: 99%